1. achievement, last week’s ministerial meeting of the WTO have earned a low, though not falling, grade. A.In case of B.In terms of C.In face of D.As a result of 查看更多

 

题目列表(包括答案和解析)

During our two months on the road,Bennett and I had a really  36  experience with a good,honest  37  and some helpful mechanics(机修师).

We were driving east on Highway 10 when our “check engine” light came on. We limped(拐)off a(n) 38  into Las Cruces. We had a real car  39 .Bennett nursed the car into a local garage. By the time the car was missing(熄火), it was shaking all over so  40 .This was the  41  time to arrive at a garage―late Friday afternoon. Service adviser Scott was busy  42  paper work and customers as we  43  our problems. 44  he was already “ten cars behind”,he told us to pull the car into the garage.

Lincoln,who we later  45  was one of the top motor technicians,took  46  of our car repairing. He and Scott and some other mechanics stayed several hours after closing, 47  the car.

Early the next morning(the shop was officially closed on Saturdays),Lincoln finally located the  48 and fixed it easily within only  49 .

Later Scott  50  out to us that it was our attitude that helped. “You didn’t come into the place demanding this or that. You showed an 51 of our problems on a busy Friday afternoon. Customer’s attitude means a lot.” He was right in some way,customers should show  52  and understanding to people who  53  them. 54  people are extremely busy,they can find a way to at least try and help when they are met with politeness.

The pleasant experience I had shows that  55  for other people can always help.

36.A.awful

B.pleasant

C.wonderful

D.terrible

37.A.station

B.studio

C.factory

D.garage

38.A.exit

B.turning

C.crossing

D.entrance

39.A.difficulty

B.examination

C.trouble                  

D.disaster

40.A.busily

B.badly               

C.quickly

D.weakly

41.A.highest

B.easiest              

C.luckiest

D.worst

42.A.at

B.on                   

C.with

D.by

43.A.explained

B.introduced

C.repeated

D.expressed

44.A.As

B.Because

C.Even

D.Though

45.A.learned         

B.understood       

C.recognized

D.thought

46.A.care

B.control             

C.charge                  

D.pride

47.A.building

B.examining

C.repairing

D.driving

48.A.problem

B.disease

C.danger                  

D.wound

49.A.days             

B.hours               

C.months                 

D.minutes

50.A.spoke

B.pointed

C.broke                    

D.blew

51.A.understanding

B.ignorance  

C.appreciation

D.awareness

52.A.cruelness

B.fairness

C.calmness               

D.politeness

53.A.comfort

B.protect             

C.serve                    

D.rescue

54.A.Even if         

B.As if

C.Even so

D.As though

55.A.obedience

B.respect

C.patience

D.mercy

 

 

查看答案和解析>>

America’s greatest technological achievement, the Hoover Dam, now has a companion piece, a bridge held up by the longest arch in the Western Hemisphere(半球). The Mike O’Callaghan-Pat Tillman Memorial Bridge, which opened this month and connects the U.S. states of Arizona and Nevada, crosses the vast chasm(峡谷)890 feet above the Colorado River that is controlled by the dam.

The striking 1,900-foot-long structure will improve traffic in the region and help protect the dam from being destroyed. It is the seventh highest bridge in the world, behind four in China, one in Papua New Guinea and one in the US state of Colorado.

“The Hoover Dam is the greatest civil engineering achievement in America’s history,” said the bridge project manager Dave Zanatell. “Our goal was not to outdo or outshine it. Our goal was to, in a respectful way, do something that would be great for our generation and that would stand besides Hoover Dam in a respectful and quality way that would become a part of Hoover’s legacy(遗产).”

Just as the Hoover Dam was built in the heart of the Great Depression(大萧条)and was seen as an example of the nation’s can-do spirit, some hope this project can also provide some uplift.

The bridge is surprising: at 1,050 feet, its support arch holds up a roadway that lies on 300-foot-long concrete pillars(柱子), some of the tallest in the world. It contains 16 million pounds of steel.

  The idea of the bridge came into being in the 1960s because the top of the Hoover Dam has been a narrow two-lane road that is the fastest route from Arizona to Las Vegas and then the Pacific Northwest and Canada.

   Access to the dam from each direction is a dangerously winding route, but massive trucks and passenger vehicles shared it for decades. During the day, when thousands of tourists travel to the dam from Las Vegas three times as many accidents as on a normal road will happen.

   The bridge has a sidewalk on the side facing the dam. The wall on both sides is 54 inches high, so walkers can take photos there.

1.Which of the following is true of the Hoover Dam?

   A. It was completed recently.

   B. It was built during the hard times.

   C. It has the longest arch.

   D. It’s the seventh highest dam in the world.

2.What is one of the purposes of building the bridge?

   A. To protect the dam.                                            B. To save the cultures.

   C. To outdo the dam.                                                   D. To develop the tourism.

3.The underlined word “uplift” in Paragraph 4 means _____.

   A. lift of the heavy object                              B. support in money

   C. spiritual encouragement                                   D. instruction in technology

4.Which of the followings shows the right position of the bridge and dam?

5.The text is mainly about ______.

   A. the Hoover Dam                                                 

   B. American western development

   C. a tour along the Colorado River                      

   D. a recently built bridge

 

查看答案和解析>>

America’s greatest technological achievement, the Hoover Dam, now has a companion piece, a bridge held up by the longest arch in the Western Hemisphere(半球). The Mike O’Callaghan-Pat Tillman Memorial Bridge, which opened this month and connects the U.S. states of Arizona and Nevada, crosses the vast chasm(峡谷)890 feet above the Colorado River that is controlled by the dam.
The striking 1,900-foot-long structure will improve traffic in the region and help protect the dam from being destroyed. It is the seventh highest bridge in the world, behind four in China, one in Papua New Guinea and one in the US state of Colorado.
“The Hoover Dam is the greatest civil engineering achievement in America’s history,” said the bridge project manager Dave Zanatell. “Our goal was not to outdo or outshine it. Our goal was to, in a respectful way, do something that would be great for our generation and that would stand besides Hoover Dam in a respectful and quality way that would become a part of Hoover’s legacy(遗产).”
Just as the Hoover Dam was built in the heart of the Great Depression(大萧条)and was seen as an example of the nation’s can-do spirit, some hope this project can also provide some uplift.
The bridge is surprising: at 1,050 feet, its support arch holds up a roadway that lies on 300-foot-long concrete pillars(柱子), some of the tallest in the world. It contains 16 million pounds of steel.
  The idea of the bridge came into being in the 1960s because the top of the Hoover Dam has been a narrow two-lane road that is the fastest route from Arizona to Las Vegas and then the Pacific Northwest and Canada.
 Access to the dam from each direction is a dangerously winding route, but massive trucks and passenger vehicles shared it for decades. During the day, when thousands of tourists travel to the dam from Las Vegas three times as many accidents as on a normal road will happen.
 The bridge has a sidewalk on the side facing the dam. The wall on both sides is 54 inches high, so walkers can take photos there.
【小题1】Which of the following is true of the Hoover Dam?

A.It was completed recently.
B.It was built during the hard times.
C.It has the longest arch.
D.It’s the seventh highest dam in the world.
【小题2】What is one of the purposes of building the bridge?
A.To protect the dam.B.To save the cultures.
C.To outdo the dam.D.To develop the tourism.
【小题3】The underlined word “uplift” in Paragraph 4 means _____.
A.lift of the heavy objectB.support in money
C.spiritual encouragementD.instruction in technology
【小题4】Which of the followings shows the right position of the bridge and dam?

【小题5】The text is mainly about ______.
A.the Hoover Dam
B.American western development
C.a tour along the Colorado River
D.a recently built bridge

查看答案和解析>>

America’s greatest technological achievement, the Hoover Dam, now has a companion piece, a bridge held up by the longest arch in the Western Hemisphere(半球). The Mike O’Callaghan-Pat Tillman Memorial Bridge, which opened this month and connects the U.S. states of Arizona and Nevada, crosses the vast chasm(峡谷)890 feet above the Colorado River that is controlled by the dam.

The striking 1,900-foot-long structure will improve traffic in the region and help protect the dam from being destroyed. It is the seventh highest bridge in the world, behind four in China, one in Papua New Guinea and one in the US state of Colorado.

“The Hoover Dam is the greatest civil engineering achievement in America’s history,” said the bridge project manager Dave Zanatell. “Our goal was not to outdo or outshine it. Our goal was to, in a respectful way, do something that would be great for our generation and that would stand besides Hoover Dam in a respectful and quality way that would become a part of Hoover’s legacy(遗产).”

Just as the Hoover Dam was built in the heart of the Great Depression(大萧条)and was seen as an example of the nation’s can-do spirit, some hope this project can also provide some uplift.

The bridge is surprising: at 1,050 feet, its support arch holds up a roadway that lies on 300-foot-long concrete pillars(柱子), some of the tallest in the world. It contains 16 million pounds of steel.

  The idea of the bridge came into being in the 1960s because the top of the Hoover Dam has been a narrow two-lane road that is the fastest route from Arizona to Las Vegas and then the Pacific Northwest and Canada.

   Access to the dam from each direction is a dangerously winding route, but massive trucks and passenger vehicles shared it for decades. During the day, when thousands of tourists travel to the dam from Las Vegas three times as many accidents as on a normal road will happen.

   The bridge has a sidewalk on the side facing the dam. The wall on both sides is 54 inches high, so walkers can take photos there.

Which of the following is true of the Hoover Dam?

   A. It was completed recently.

   B. It was built during the hard times.

   C. It has the longest arch.

   D. It’s the seventh highest dam in the world.

What is one of the purposes of building the bridge?

   A. To protect the dam.                                 B. To save the cultures.

   C. To outdo the dam.                                       D. To develop the tourism.

The underlined word “uplift” in Paragraph 4 means _____.

   A. lift of the heavy object                            B. support in money

   C. spiritual encouragement                           D. instruction in technology

Which of the followings shows the right position of the bridge and dam?

The text is mainly about ______.

   A. the Hoover Dam                                    

   B. American western development

   C. a tour along the Colorado River               

   D. a recently built bridge

查看答案和解析>>

America’s greatest technological achievement, the Hoover Dam, now has a companion piece, a bridge held up by the longest arch in the Western Hemisphere(半球). The Mike O’Callaghan-Pat Tillman Memorial Bridge, which opened this month and connects the U.S. states of Arizona and Nevada, crosses the vast chasm(峡谷)890 feet above the Colorado River that is controlled by the dam.

The striking 1,900-foot-long structure will improve traffic in the region and help protect the dam from being destroyed. It is the seventh highest bridge in the world, behind four in China, one in Papua New Guinea and one in the US state of Colorado.

“The Hoover Dam is the greatest civil engineering achievement in America’s history,” said the bridge project manager Dave Zanatell. “Our goal was not to outdo or outshine it. Our goal was to, in a respectful way, do something that would be great for our generation and that would stand besides Hoover Dam in a respectful and quality way that would become a part of Hoover’s legacy(遗产).”

Just as the Hoover Dam was built in the heart of the Great Depression(大萧条)and was seen as an example of the nation’s can-do spirit, some hope this project can also provide some uplift.

The bridge is surprising: at 1,050 feet, its support arch holds up a roadway that lies on 300-foot-long concrete pillars(柱子), some of the tallest in the world. It contains 16 million pounds of steel.

  The idea of the bridge came into being in the 1960s because the top of the Hoover Dam has been a narrow two-lane road that is the fastest route from Arizona to Las Vegas and then the Pacific Northwest and Canada.

   Access to the dam from each direction is a dangerously winding route, but massive trucks and passenger vehicles shared it for decades. During the day, when thousands of tourists travel to the dam from Las Vegas three times as many accidents as on a normal road will happen.

   The bridge has a sidewalk on the side facing the dam. The wall on both sides is 54 inches high, so walkers can take photos there.

1.Which of the following is true of the Hoover Dam?

   A. It was completed recently.

   B. It was built during the hard times.

   C. It has the longest arch.

   D. It’s the seventh highest dam in the world.

2.What is one of the purposes of building the bridge?

   A. To protect the dam.                                 B. To save the cultures.

   C. To outdo the dam.                                       D. To develop the tourism.

3.The underlined word “uplift” in Paragraph 4 means _____.

   A. lift of the heavy object                      B. support in money

   C. spiritual encouragement                           D. instruction in technology

4.Which of the followings shows the right position of the bridge and dam?

5.The text is mainly about ______.

   A. the Hoover Dam                                    

   B. American western development

   C. a tour along the Colorado River               

   D. a recently built bridge

查看答案和解析>>


同步练习册答案